|
When can we take the painted ceramic piece home? |
|
The firing process takes about 4 days during which time: - the piece is left to dry over-night;
- it is glazed and left to dryagain;
- the glaze is smoothed over and the piece loaded into the kiln;
- the firing is a 24 hour cycle by the time the kiln reaches it's full heat and then cooled slowly (for best results);
- the piece is unloaded from the kiln and checked for any cracks or abnormalities which are all part of the "nature of ceramics"
- your piece is then matched to the description on your docket and wrapped ready for pick-up.
|